Thursday, December 9, 2010

Unhandled Exception C000000500652f30

My first scheme

This summer I published a photo of a pair of shoes that I did for a friend. Having written the scheme came to my mind to post it on Ravelry .. and soon some girls have tried it, although so far only showed pictures
.. I'm really happy about this scheme, however simple, like a lot.
Here it here:

Shoes

This is not a real pattern, but simply notes that I jotted down while doing the first pair of shoes were invented by me.
Then use yarn and size of shoes that you prefer.

I used the 4 mm circular needles, and the result was a size 6 months. For a smaller size using irons to a lesser extent.

Abbreviazioni
m: maglia
d: diritto
r: rovescio
SKP: passare 1 m, 1 d, accavallare la maglia passata.

Orlo
Montare 38m e chiudere a cerchio.
Lavorare 15 giri a punto coste 1/1.
Lavorare 15 giri a diritto

Piede
Lavorare 24 m a diritto. Voltare il lavoro e lavorare 10 m a rovescio.
Lavorare altri 13 ferri a maglia rasata su queste 10 m in ferri di andata e di ritorno.
Quindi riprendere e lavorare 9 m sul lato del collo del piede (aiutandosi con un uncinetto) e continuare lavorando le 14 m later.

continue working in a circle: 14 m at the beginning of the tour, return to work and 9 m on the side of the instep, make 1 increase, work 10 m, make 1 increase, work 23 m (58 m)

Till law for 14 rows on these 58 m

sole
(* 5 d, SKP * 4 times, 1 d) 2 times (50 m) an iron law

(* 4 d, 4 * SKP times, 1 d) 2 times (42 m)
an iron law
(* 3 d, SKP * 4 times, 1 d) 2 times (34 m)
an iron law
(* 2 d, SKP * 4 times, 1 d) 2 times (26 m) 2 rows straight


Quit using the technique of 3 grilled or one you prefer.


And we hope that this is the first in a long series:)!
If only I knew how to put a list of files in pdf at the side, so as to make it available always ..

0 comments:

Post a Comment